EasyManua.ls Logo

NEC Storage Manager - iSM11561: Rebuild option was selected. (<aaa...a>); iSM11562: Spare Rebuild option was selected. (<aaa...a>); iSM11563: iSMrepair was executed.; iSM11564: PD Group Number was too large.

NEC Storage Manager
710 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2 Message List
290
iSM11561: Rebuild option was selected.
(<aaa...a>)
[Classification] INFO
[Explanation] “Rebuild” option was selected.
aaa...a : Additional information
[Measures] Unnecessary
iSM11562: Spare Rebuild option was selected.
(<aaa...a>)
[Classification] INFO
[Explanation] “Spare Rebuild” option was selected.
aaa...a : Additional information
[Measures] Unnecessary
iSM11563: iSMrepair was executed.
[Classification] INFO
[Explanation] iSMrepair was executed.
[Measures] Unnecessary
iSM11564: PD Group Number was too large.
[Classification] INFO
[Explanation] PD Group number exceeds the range that can be specified.
[Measures] Check whether the input parameter is correct.

Table of Contents

Other manuals for NEC Storage Manager

Related product manuals