X3
Fig. 3‐18
Fig. 3‐19
Installation
3‐20
P/N 213828_11
2014 Nordson Corporation
VersaBlue_PPA
Installing Kit (Accessory) (contd.)
8. Insert the light tower plug into X3 of the I/O module OR, if the adapter
cable P/N 7157856 or P/N 7157863 is already connected there, use the
free connection for the adapter cable (Refer to Fig. 3‐17).
9. Use a cable tie to fasten the cable to one of the metal teeth (5, Fig. 3‐17)
below the bracket Cable duct.
10. Slide the bracket down and tighten the knurled nuts.
11. With software versions < 6.32.023: To activate the light tower, the new
software configuration code must
be entered; with all other versions, it
should be entered. Box: 17 Code: W. Refer to section Operation, Key
Melter configuration (V26 in the overview).
Casters
Configuration code Box 21:C
Installing Kit (Accessory)
The kit consists of a pair of casters with brakes and a pair without brakes.
NOTE: Attach the casters with brakes (Fig. 3‐19, right) to the side of the
electrical cabinet.
1. Lift the melter with a suitable floor conveyor (lift truck or forklift).
2. Detach machine feet.
NOTE: The back plug plate must be removed before the back left machine
foot can be detached.
3. Attach casters. Use the fastening holes for the machine feet to attach the
casters.
Torque: 24 Nm (212 lbin)