Installing the OSP cables 4-7
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 4-1 (continued)
Pulling the OSP cabling into the cabinet
Figure 4-1
Conduit openings in the S800A cabinet
FW-15100
—end—
0.00
5.85 in.
12.62 in.
19.39 in.
22.78 in.
26.16 in.
14.86 cm
32.05 cm
49.25 cm
57.86 cm
66.44 cm
0.00
2.71 in.
5.04 in.
6.88 cm.
12.80 cm.
170.33 cm
185.44 cm
186.11 cm
182.88 cm
203.20 cm
67.06 in.
73.01 in.
73.27 in.
72.00 in.
80.00 in.
10.50 in
12.00 in
14.50 in
18.50 in
20.65 in
21.88 in
24.90 in
27.88 in
32.00 in
26.67 cm
30.48 cm
36.83 cm
46.99 cm
52.45 cm
55.58 cm
63.25 cm
70.82 cm
81.28 cm
0.00
Edge of raised
section of pad
Conduit size table
(All conduits: schedule 40 PVC)
A
B
C
D
E
1.00 in.
1.25 in.
2.00 in.
2.50 in.
4.00 in.
2.54 cm
3.18 cm
5.08 cm
6.35 cm
10.16 cm
Conduit Trade size
1.50 in.
2.00 in.
3.00 in.
3.50 in.
4.50 in.
3.81 cm
5.08 cm
7.62 cm
8.89 cm
11.43 cm
Opening
FW-15100
Edge of raised
section of pad
VF (1-600)
E
VF (601-1200)
E
VF (Misc.)
E
HF or fiber
E
Ground (Where required by local code)
B
Ground
(AC service)
A
AC entrance
C
Misc.
Misc.
AC entrance
D
Misc.
B
Misc.
B
C
Miscellaneous
(DC feed, when
required)
B
B