9-12 Installing and connecting the batteries
AccessNode 323-3001-210 Issue 1.0
Procedure 9-1 (continued)
Installing 12 V batteries in a cabinet
Step Action
11 Route, but do not connect, the BBP ends of the battery cables to the battery
interface connector field on the rear left swing frame. Secure the cables to the
swing frame with tie wraps (see Figure 9-5).
Figure 9-5
12 V battery cable routing
FW-15156
—continued—
Batteries on floor
of cabinet
TB4
HENDRY
RPTR 2
RPTR 1
DSX-1
1414
1111
9
12
13
13
12
9
10
10
Battery interface
connector field
Rear left
swing frame
open
Rear right
swing frame
open
FW-15156
View facing AC compartment View facing termination compartment
NT1W64AA