Contents
vii
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 6-4 Connecting the VF cable pairs to BIX connectors without the
cross-connect 6-16
Procedure 6-5 Connecting the VF cable pairs 601–1200 to 710 or 3M MS2 DPM
connectors with cross-connect 6-23
Procedure 6-6 Connecting the VF cable pairs 1–600 to 710 or 3M MS2 DPM
connectors with cross-connect 6-30
Procedure 6-7 Splicing the binder groups using 710 or 3M MS2 DPM
connectors 6-33
Procedure 6-8 Connecting the outside plant cable pairs to 710 or 3M MS2 DPM
connectors without cross-connect 6-36
Routing and splicing the fiber cable 7-1
How to use this chapter 7-1
Chapter task list 7-1
Prerequisites for installation 7-2
Precautions 7-3
Cable entry 7-4
Procedure 7-1 Routing the OSP fiber cable directly to the FPP 7-5
Procedure 7-2 Routing the OSP fibers in split flex tubing to the FPP 7-15
Procedure 7-3 Routing the fiber patch cords from the ABM to the FPP 7-20
Procedure 7-4 Routing fiber to the ABM when no FPP is installed 7-32
Provisioning the external alarms 8-1
How to use this chapter 8-1
Chapter task list 8-1
Prerequisites for installation 8-2
Procedure 8-1 Provisioning and verifying the external alarms 8-3
Procedure 8-2 Wiring customer reserved optional defined external alarms 8-5
Installing and connecting the batteries 9-1
Chapter task list 9-1
Prerequisites for installation 9-1
Battery options 9-2
Battery cables 9-2
Procedure 9-1 Installing 12 V batteries in a cabinet 9-4
Procedure 9-2 Installing 6 V batteries in a cabinet 9-14
Procedure 9-3 Wiring the cabinet when the batteries are installed in the battery
vault 9-26
Adjusting the rectifier and the dc distribution shelf 10-1
How to use this chapter 10-1
Chapter task list 10-2
Prerequisites for installation 10-2
Cautions 10-2
Procedure 10-1 Powering the rectifier(s) 10-4
Procedure 10-2 Adjusting high voltage shutdown 10-11
Procedure 10-3 Adjusting equalize voltage 10-14
Procedure 10-4 Adjusting float voltage 10-16
Procedure 10-5 Adjusting the second or third rectifiers 10-18
Procedure 10-6 Adjusting load sharing for more than one rectifier 10-20
Procedure 10-7 Verifying dc distribution shelf alarms 10-23