EasyManua.ls Logo

Nortel SONET AccessNode 800A Series - Page 9

Nortel SONET AccessNode 800A Series
450 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Contents
vii
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 6-4 Connecting the VF cable pairs to BIX connectors without the
cross-connect 6-16
Procedure 6-5 Connecting the VF cable pairs 601–1200 to 710 or 3M MS2 DPM
connectors with cross-connect 6-23
Procedure 6-6 Connecting the VF cable pairs 1–600 to 710 or 3M MS2 DPM
connectors with cross-connect 6-30
Procedure 6-7 Splicing the binder groups using 710 or 3M MS2 DPM
connectors 6-33
Procedure 6-8 Connecting the outside plant cable pairs to 710 or 3M MS2 DPM
connectors without cross-connect 6-36
Routing and splicing the fiber cable 7-1
How to use this chapter 7-1
Chapter task list 7-1
Prerequisites for installation 7-2
Precautions 7-3
Cable entry 7-4
Procedure 7-1 Routing the OSP fiber cable directly to the FPP 7-5
Procedure 7-2 Routing the OSP fibers in split flex tubing to the FPP 7-15
Procedure 7-3 Routing the fiber patch cords from the ABM to the FPP 7-20
Procedure 7-4 Routing fiber to the ABM when no FPP is installed 7-32
Provisioning the external alarms 8-1
How to use this chapter 8-1
Chapter task list 8-1
Prerequisites for installation 8-2
Procedure 8-1 Provisioning and verifying the external alarms 8-3
Procedure 8-2 Wiring customer reserved optional defined external alarms 8-5
Installing and connecting the batteries 9-1
Chapter task list 9-1
Prerequisites for installation 9-1
Battery options 9-2
Battery cables 9-2
Procedure 9-1 Installing 12 V batteries in a cabinet 9-4
Procedure 9-2 Installing 6 V batteries in a cabinet 9-14
Procedure 9-3 Wiring the cabinet when the batteries are installed in the battery
vault 9-26
Adjusting the rectifier and the dc distribution shelf 10-1
How to use this chapter 10-1
Chapter task list 10-2
Prerequisites for installation 10-2
Cautions 10-2
Procedure 10-1 Powering the rectifier(s) 10-4
Procedure 10-2 Adjusting high voltage shutdown 10-11
Procedure 10-3 Adjusting equalize voltage 10-14
Procedure 10-4 Adjusting float voltage 10-16
Procedure 10-5 Adjusting the second or third rectifiers 10-18
Procedure 10-6 Adjusting load sharing for more than one rectifier 10-20
Procedure 10-7 Verifying dc distribution shelf alarms 10-23

Table of Contents

Related product manuals