Chapter 1: Installation and Initial Configuration
Power Meter (PMM) Connectors and Controls
Voltage Measurement.
Power
Factory Use (Do not connect.)
Meter Bus Terminator Switch
Meter Bus Connectors. Connects PMM
to Controller.
Factory Use (Do not connect.)
Multi-conductor Cable CT ABCNE
Connector
Meter ID Configuration Switch
Expansion Port. Connects PMM to PMB