EasyManua.ls Logo

Ricoh D009 - Page 102

Ricoh D009
1209 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1000-Sheet Finisher (B408)
D009/D011/D012/D013/D091/D092 2-56 SM
The holder bracket [3] must be placed outside the front joint bracket [2]. The
holder bracket [3] is provided with the Bridge Unit (D386).
3. Install the grounding plate [5] on the finisher (
x 2; M3 x 8)
Use the screw removed in step 1 and the screw from the accessory box.
4. Open the front door [6] then pull the locking lever [7].
5. Align the finisher on the joint brackets, and lock it in place by pushing the locking lever.
6. Secure the locking lever (1 knob screw; M3 x 8).
7. Close the front door.
8. Install the copy tray [8] (1 knob screw; M4 x 10).
9. Connect the finisher cable [9] to the main machine as shown above.

Table of Contents

Related product manuals