Date Code 20001006 Firmware Upgrade Instructions B-5
SEL-351 Instruction Manual
15. Execute the Status (STA) command to verify that all relay self-test parameters are within
tolerance, and that the relay is enabled.
16. If the Breaker Wear Monitor was being used, check the data using the BRE command to
see if the breaker wear data was retained through the upgrade procedure. If it was not
retained, use the BRE W command to reload the values saved in Step 1.
17. Apply current and voltage signals to the relay. Issue the MET command; verify that the
current and voltage signals are correct. Issue the Trigger (TRI) and Event (EVE)
commands. Verify that the current and voltage signals are correct in the event report.
The relay is now ready for your commissioning procedure.