EasyManua.ls Logo

Segway SE-3 Patroller - Pre-Ride Checklist; Essential Checks Before Riding

Segway SE-3 Patroller
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual 83
Figure 114: Rider Detect Mat Harness
Installation
1. Make sure the SE-3 Patroller is powered off,
unplugged, and the parking brake is engaged.
2. Orient the Rider Detect Mat on the SE-3 Patroller with
the wire harness toward the front.
3. Feed the wire harness through the hole in the frame.
4. Connect the wire harness to the left side of the PI
Board. See Figure 113.
5. Slide the Rider Detect Mat in place. The front should
rest under the tab and the rear should line up with the
threaded studs.
6. Using a 3 mm hex wrench, install the four fasteners
as shown in Figure 112.
Torque to 4.0 N-m (3.0 ft-lbf).
7. Install the following components:
a. Left Side Panel (page 20).
b. Light Cluster (page 18).
c. Front Cowl (page 17).
d. Glove Box (page 16).
e. Bib Panel (page 14)
f. Storage Trays (page 13).
g. Battery Module (page 8).
8. Perform post-service tests (page 127).
Rider Detect Mat

Table of Contents

Other manuals for Segway SE-3 Patroller