6-7
Batch
flexible
, Manual
C79000-G7076-C650-02
6.3 Planning batches
To plan a batch you need only specify the following information:
S Batch designation
S Recipe:
– A recipe can be selected from the general recipe list
– To make recipe selection simpler you can first select the product and
quality designation
S Concrete batch quantity
You can also add the following as further details:
S Starting mode:
S Planned starting or finishing dates and times
In the recipe for a batch you can:
S Change the values of the $ variables (if these are included in the recipe)
S Change the time for which an apparatus is reserved and thereby change
the batch run time (this is useful when the occupancy times are dependent
on the batch quantity)
Planning data
Batch planning