7-5
Batch
flexible
, Manual
C79000-G7076-C650-02
7.3 Preparation of the batch data
Like all BATCH flexible applications you can start and terminate batch data
preparation in BOM (see Chapter 3.3.1). In normal operation, batch data
preparation is started automatically by batch control when a batch starts and
remains active as long as at least one batch is being processed on-line (by
batch control) and batch control itself is still active.
flexible
DB
BOM
BATCH
Batch
control
Batch data
preparation
starts
ends
starts
Measured values
and messages
Actual values and
setpoint values
Logging batch data,
exporting batch data
acquires:
acquires:
Record
Export data
Figure 7-2
Batch data preparation in interaction with batch control and BOM
Communication with the OS applications MESS (signaling) and PDA
(process data acquisition) takes place cyclically via the API interface. The
cycle for reading batch data is a system setting and can be configured in the
configuration dialog (see Chapter 3.6).
Activation
How are the batch
data prepared?
Batch data management