Data backup and series commissioning
9.2 Backing up and transferring settings via STARTER
SINAMICS G110M Operating Instructions
Operating Instructions, 04/2015, FW V4.7.3, A5E31298649B AD
269
9.2
Backing up and transferring settings via STARTER
With the supply voltage switched on,
you can transfer the converter settings
from the converter to a PG/PC, or the
data from a PG/PC to the converter.
This require
s you to have installed the
STARTER commissioning tool on your
PG/PC.
You will find additional information about STARTER in Chapter:
Basic commissioning with
STARTER
(Page 106).
Inverter
PC/PG
Procedure with STARTER
To back up the settings with STARTER, proceed as follows:
1. Go online:
.
2. Click the "Download project to PG" button:
.
3. Save the project:
.
4. Wait until STARTER reports that data backup has been completed.
5. Go offline:
.
You have backed up the settings with STARTER.
Procedure with Startdrive
To back up the settings with Startdrive, proceed as follows:
1. Go online.
2. Select "Online" > "Upload device to PG/PC."
3. Back up the project with "Project" > "Save."
4. Wait until Startdrive reports that data backup has been completed.
5. Go offline.
You have backed up the settings with Startdrive.