Installation
4.2 System Installation
SINAMICS G110M Operating Instructions
Operating Instructions, 04/2015, FW V4.7.3, A5E31298649B AD
47
8.
Connecting the mains earth cable (HANQ variant)
1. Connect the HANQ earth connection to the earthing post of the
terminal housing.
2. Tighten the earthing post screw to 1.5 Nm.
Note:
If the SINAMICS G110M is ordered as a complete system, then all
mechanical and electrical installation is completed in the factory prior
to delivery.
9.
Connecting the mains cables (HANQ variant)
1. Ensure that the cable clamp has been removed.
2. Connect the HANQ L1, L2 and L3 connections to the L1, L2 and
L3 connections on the mains connector.
3. When the connections are completed, replace the cable clamp
over the cables (ensuring that the cable clamp is the correct way
round).
Note:
Tightening torque of the mains terminals are a maximum of 0.8 Nm.