EasyManua.ls Logo

Siemens SINAMICS G110M - Page 51

Siemens SINAMICS G110M
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
4.2 System Installation
SINAMICS G110M Operating Instructions
Operating Instructions, 04/2015, FW V4.7.3, A5E31298649B AD
51
16.
Final connection and adjustments
1. Connect the temperature sensor connector into the connector at
the top edge of the CPI.
2. Connect the small communications connector into the connector
at the top of the CPI.
3. Connect the large communications connector into the connector
on the top of the Control Module.
4. Connect the CPI ribbon cable to the connector on the top of the
Control Module.
5. Configure the DIP switches to the requirements of the application
(see Step 17 below).
Note:
The PROFIBUS/PROFINET communications cable is not pre-fitted to
the Control Module, it is part of the accessories supplied in the prod-
uct packaging.
17.
PROFIBUS / USS address and basic commissioning DIP-switches
There are three sets of DIP-switches that allow the user to configure
the network device address and perform a basic commissioning of
the system.
For further information, please see Basic Commissioning with DIP
switches (Page 93)
18.
PROFIBUS / USS network termination switch
When using the PROFIBUS or USS communications protocols, the
last converter on the network must have the network termination
switch in the ON position.

Table of Contents

Other manuals for Siemens SINAMICS G110M

Related product manuals