EasyManua.ls Logo

Siemens SITRANS FUG1010 IP65 NEMA 4X - Page 183

Siemens SITRANS FUG1010 IP65 NEMA 4X
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Instructions
CC129A-7
4
z After determining the best sheet cutting pattern from suggestions above, mark the pipe for the
starting edge of the dry couplant sheet position.
z Partially peel the sheet backing 1 to 2 inches from the starting edge, then carefully locate and
press against the pipe surface.
zWhile pressing firmly and sliding your hand against the sheet (along the pipe surface), slowly
peel away the backing such that it prevents the trapping of air.
z Apply the film slowly and carefully so that the sheet does not wrinkle, stretch or overlap,
especially under the transducer contacting surfaces.
z Use the wooden hand roller supplied to smooth the film and assure adhesion to the pipe surface.
zApply additional layers (if required) while avoiding any seams under the transducers.
zUse the wooden hand roller on each layer applied.
z Record final thickness of CC129-1A (from Table 1) for later entry into the 1010GC flowmeter.
CN4973 February 2005
ROLL IN LINE WITH PIPE AXIS
CC129-1A
WOODEN
ROLLER

Table of Contents

Related product manuals