72
KEB Introduction
EQUIPMENT/SETTINGS VERIFICATION
Verify that the Job Specification parameter table on the drawings
“Sheet 1: Getting Started” matches the actual equipment.
Below is a sample table showing the important values that will
affect operation.
Scroll through the motor parameters and verify that they are set to the
motor nameplate values prior to performing the Motor Learn procedure.
Sample: Sheet 1: - Getting Started
Motor
Volts
Motor
Amps
Motor
RPM
Motor
Poles
Motor
HP
Brake Volts
Pick/Hold
Encoder
PPR
Main Line
Volts
Motor
Frequency

Table of Contents