General commissioning
Initial commissioning
NOTE
Observe the section entitled
Safe handling of
consumables
.
Prior to initial commissioning, make sure that
the entire industrial truck is properly assem-
bled. All electrical and hydraulic connections
must be checked. Mechanical connections
that were removed for transportation must be
reconnected with particular care. Check all
screw connections with the appropriate tor-
que. Commissioning can begin once the filling
levels for the hydraulic tank and for the gear-
box have been checked. The entire initial
commissioning process must be correctly per-
formed by our trained service personnel.
NOTE
During the daily commissioning process, work
through the
Checklist before starting work
.
Weights of the units
Industrial trucks are mainly transported in a
disassembled state and must be assembled
on site. You must ascertain the weight of the
individual units in order to assemble the truck
safely and to select a suitable harness. Our in-
dustrial trucks are constructed using a modu-
lar system. There are also many customised
specifications. For this reason, it is difficult to
specify the correct weight for each unit and for
each variant. The information and table for the
lift masts below provide rough guidelines. For
safety reasons, always add a generous mar-
gin when rounding up the determined value.
Operation
4
General commissioning