COOLING AND LUBRICATION SYSTEM 5-19
• Install the new O-rings
1 and
2.
• Apply grease to the O-rings.
* 99000-25030: SUZUKI SUPER GREASE “A” (USA)
99000-25010: SUZUKI SUPER GREASE “A” (Others)
• Install the water pump body with the impeller to the clutch
cover.
• Install the E-ring to the impeller shaft.
• Install the washer
1, pin
2, water pump driven gear
3 and
snap ring
4.