EasyManua.ls Logo

Suzuki LT-Z400 - Page 140

Suzuki LT-Z400
304 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
COOLING AND LUBRICATION SYSTEM 5-19
Install the new O-rings
1 and
2.
Apply grease to the O-rings.
* 99000-25030: SUZUKI SUPER GREASE A (USA)
99000-25010: SUZUKI SUPER GREASE A (Others)
Install the water pump body with the impeller to the clutch
cover.
Install the E-ring to the impeller shaft.
Install the washer
1, pin
2, water pump driven gear
3 and
snap ring
4.

Table of Contents

Other manuals for Suzuki LT-Z400

Related product manuals