EasyManua.ls Logo

Suzuki RM-Z450 - Page 113

Suzuki RM-Z450
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CYLINDER HEAD, CYLINDER AND PISTON 6-28
Pull the exhaust side of the cam chain taut to install the camshaft sprocket (exhaust side).
Turn the exhaust camshaft so that the timing mark
C is aligned with the gasket surface of the cylinder
head. Engage the cam chain with the exhaust camshaft sprocket.
The other timing marked
D should now be pointing straight up. Starting from the roller pin that is directly
above the timing marked
D, count out 14 roller pins (from the exhaust camshaft side going towards the
intake camshaft side).
Engage the 14th roller pin on the cam chain with the timing marked
E on the camshaft sprocket (intake
side). Refer to the following illustrations.
NOTE:
The cam chain should now be on all three sprockets. Be careful not to move the crankshaft until the cam-
shaft journal holder and cam chain tension adjuster are secured.
Install the dowel pins and C-ring
1.
Install the camshafts, intake and exhaust.
Apply grease to the new O-ring and install it to the camshaft
journal holder.
' 99000-25010: SUZUKI SUPER GREASE “A”
or equivalent
1st pin
14th pin
CAUTION
Use the new O-ring to prevent oil leakage.

Table of Contents

Other manuals for Suzuki RM-Z450

Related product manuals