EasyManua.ls Logo

Suzuki RM-Z450 - Camshaft (Automatic Decomp.) and Cam Chain Tension Adjuster Installation

Suzuki RM-Z450
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-27 CYLINDER HEAD, CYLINDER AND PISTON
CAMSHAFT (AUTOMATIC DECOMP.) AND CAM CHAIN TENSION
ADJUSTER INSTALLATION
Install the camshaft and cam chain tension in the reverse order
of removal. Pay attention to the following points:
CAMSHAFT (AUTOMATIC DECOMP.)
Place a wrench over the crankshaft and turn it counter-clock-
wise to align the TDC mark
A with the center of the groove
B
of the timing inspection hole.
Just before installing the camshaft into the cylinder head,
apply engine oil to the camshaft journals, camshaft journal
holder, camshaft bearings and cam faces.
CAUTION
Pull the cam chain upward, or the chain will be caught
between crankcase and cam drive sprocket.
To adjust the camshaft timing correctly, be sure to
align the TDC mark
A with the index mark
B and hold
this position when installing the camshafts.

Table of Contents

Other manuals for Suzuki RM-Z450

Related product manuals