EasyManua.ls Logo

Suzuki RM-Z450 - Oil Relief Valve Inspection; Oil Relief Valve Installation; Oil Seal Inspection; Oil Seal Removal

Suzuki RM-Z450
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LUBRICATION SYSTEM 11-4
OIL RELIEF VALVE INSPECTION
Inspect the operation of the oil relief valve by pushing on the
piston with a proper bar.
If the piston does not operate, replace the oil relief valve with
a new one.
OIL RELIEF VALVE INSTALLATION
Apply engine oil to the O-ring and press in the oil relief valve
to the right crankcase cover.
Install the right crankcase cover. (!8-6)
OIL SEAL REMOVAL
Remove the right crankcase cover. (!8-3)
Remove the snap ring
1.
"
09900-06108: Snap ring pliers
Remove the oil seal.
OIL SEAL INSPECTION
For oil seal inspection other than the following, refer to page 10-8.
Inspect the oil seal lip for wear and damage.
If any defects are found, replace the oil seal with a new one.
CAUTION
Use the new O-ring to prevent oil leakage.

Table of Contents

Other manuals for Suzuki RM-Z450

Related product manuals