EasyManua.ls Logo

Suzuki RM-Z450 - Installation

Suzuki RM-Z450
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KICK STARTER 8-5
INSTALLATION
Install the kick starter in the reverse order of removal. Pay atten-
tion to the following points:
Install the kick starter guide
1.
# Kick starter guide bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Install the kick starter drive gear
2, washer
3 and snap ring
4 onto the kick starter shaft.
" 09900-06107: Snap ring pliers
Install the spring guide
5 onto the kick starter shaft.
NOTE:
Align the concave of spring guide
A with kick starter shaft hole
B.
Install the return spring
6 into the kick starter shaft hole.
Install the kick starter
7 onto the kick starter shaft.
NOTE:
Be sure to align the punch marks on the kick starter and kick
starter shaft when fitting the kick starter.
CAUTION
Replace the snap ring
4 with a new one.

Table of Contents

Other manuals for Suzuki RM-Z450

Related product manuals