EasyManua.ls Logo

Suzuki RM-Z450 - Installation

Suzuki RM-Z450
373 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-9 COOLING SYSTEM
INSTALLATION
Install the water pump in the reverse order of removal. Pay
attention to the following points:
OIL SEAL
Apply THREAD LOCK SUPER to the outer surface of the oil
seal.
% 99000-32110: THREAD LOCK SUPER “1322”
or equivalent
Press the oil seal with the suitable size socket wrench.
Apply grease to the oil seal lips.
& 99000-25010: SUZUKI SUPER GREASE “A
or equivalent
IMPELLER AND WATER PUMP SHAFT
Apply engine oil to the water pump shaft.
Hold the water pump shaft with a wrench and tighten the
impeller to the specified torque.
! Impeller: 9 N·m (0.9 kgf-m, 6.5 lb-ft)
CRANKCASE COVER
Install the dowel pins and gasket
1 and O-ring
2.
CAUTION
Use the new gasket
1 and O-ring
2 to prevent engine
oil leakage.

Table of Contents

Other manuals for Suzuki RM-Z450

Related product manuals