203
26. CROSS SECTION SURVEY
3. Select "Xsection Survey" in <Xsection
Survey>
4. Input road name for cross section
survey, station pitch, station
increment, stationing chainage and
select direction. Then press [OK].
•Press [STA-]/[STA+] to decrease/
increase the pitch set in "Sta incr"
from/to "Stationing chainage".
Stationing chainage is displayed as
"xx+xx.xx".
• In the event that stationing chainage
was the same as the prior
observation, cross-section survey is
judged to have finished and a
confirmation message window is
displayed. Press [YES] to proceed to
step 5. Press [NO] to set station
pitch, station chainage, and direction
again.
5. Sight the last point on the cross-
section and press [MEAS].
" Direction""
•Press [HT] to set instrument and
target height.
•Press [OFFSET] on the second
page to perform offset measurement
for the last point.
• When observing the center point
first, the center point needs to be set.
Step 8
Xsection Survey
Occ.Orien.
Xsection Survey
EDM
Xsection Survey
Road name:
Sta pitch:
OK
100.000m
Road3
A
Sta incr:
Sta..ing:
Direc.:
STA-
STA+
OK
10.000m
55.200m
Left Right