EasyManua.ls Logo

Topcon ES-101 - Page 213

Topcon ES-101
324 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
203
26. CROSS SECTION SURVEY
3. Select "Xsection Survey" in <Xsection
Survey>
4. Input road name for cross section
survey, station pitch, station
increment, stationing chainage and
select direction. Then press [OK].
•Press [STA-]/[STA+] to decrease/
increase the pitch set in "Sta incr"
from/to "Stationing chainage".
Stationing chainage is displayed as
"xx+xx.xx".
In the event that stationing chainage
was the same as the prior
observation, cross-section survey is
judged to have finished and a
confirmation message window is
displayed. Press [YES] to proceed to
step 5. Press [NO] to set station
pitch, station chainage, and direction
again.
5. Sight the last point on the cross-
section and press [MEAS].
" Direction""
•Press [HT] to set instrument and
target height.
•Press [OFFSET] on the second
page to perform offset measurement
for the last point.
When observing the center point
first, the center point needs to be set.
Step 8
Xsection Survey
Occ.Orien.
Xsection Survey
EDM
Xsection Survey
Road name:
Sta pitch:
OK
100.000m
Road3
A
Sta incr:
Sta..ing:
Direc.:
STA-
STA+
OK
10.000m
55.200m
Left Right
Same Sta...ing
NO
YES
N
E
Z
HT
P1
MEAS OK
ZA
HA-R

Table of Contents

Related product manuals