Page 14
Status Box Messages
The status box on the run display shows information before, during, and
after a test. Three kinds of facts are displayed in the status box—test type
set to run, test phase, and results of the completed test.
Test Mode Status
These messages appear before a test is started. Press and hold down the
START switch to see the kind of test Sprint is set to run. If Sprint is set to
run linked tests, the status box shows the first test type in a series. After
releasing the
START switch, the test begins.
Pd Sprint is set to run a pressure decay test.
OCC
Sprint is set to run an occlusion test.
Flow Sprint is set to run a flow test.
Burst Sprint is set to run a burst test.
Test Phase Status
These messages display during a test and before pass or fail lights turn on.
Couple One or more coupling valves have opened, or a test
is in a wait period to allow an external fixture to
activate.
Fill
Product is being filled with air.
Stab
A pressure decay leak test is in stabilization phase.
Test A pressure decay, flow, or burst test is in test
(measured) phase.
Dump
The dump valve has opened to atmosphere to release
pressure in the product and test circuit.