Maintenance3326−2/A2
Winterthur Gas & Diesel Ltd.
10/ 10
6. Clearance Checks
1) Do the clearance checks, refer to 3326−1.
7. Completion
1) Install the round nuts to the elastic studs on the connecting rod, refer to 9403−4.
2) Install the top bearing cover, refer to 3303−5 paragraph 3.
3) Attach the piston to the crosshead, refer to 3303−5 paragraph 4.
4) Set to on the lubricating oil pump.
5) Make sure that the crosshead and the bottom end bearings of the connecting rod
have sufficient lubrication.
6) Remove all tools and equipment from the work area.
Crosshead Pin − Removal and Installation
2016