Maintenance11322/A1
Winterthur Gas & Diesel Ltd.
2/ 14
2. Main Bearing Covers
No. 2 to No. 8
Removal
2.1 Tools Installation
1) Remove the oil pipe(1, Fig. 1) from the
main bearing cover (2).
2) Apply protection to all openings.
3) Attach the work platform (94142,
Fig. 2).
4) Use the feeler gauge (94123) to do a
check of the bearing clearance, refer to
03301.
2016
Main Bearing Removal and Installation
1
Fig. 1
2
Fig. 2
94142
WCH02325
Note: Some parts can look different