Test the grease pump MEMOLUB
®
(verify function)
CAUTION
It is important that you run this test cycle only if a cartridge is in place, otherwise
you will fill the pump with air.
To verify that the grease pump is working well after a maintenance operation, press
one of the 3 connectors located on the base during a few seconds. The grease
pump is starting a dispensing cycle. The completion of the cycle means that the
battery and the control board of the grease pump are working well.
xx1400001578
Product manual - IRBT 2005 143
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
2 Installation and commissioning
2.8.1 Replacing the grease cartridge in grease pump MEMOLUB
®
EPS
Continued

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB IRBT 2005 and is the answer not in the manual?

ABB IRBT 2005 Specifications

General IconGeneral
BrandABB
ModelIRBT 2005
CategoryRobotics
LanguageEnglish

Related product manuals