NTP 100 —  Install a B-0404-A
NTP 100-6 November 2013 Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01 3FE 55873 AAAA TCZZA
ONT Product Information Guide
Figure NTP 100-4: B-0404-A with power converter
ii Connect the power supply to the ONT as shown in Figure NTP 100-5.
Figure NTP 100-5: B-0404-A power connection
iii Go to step 13.
12 Connect the B-0404-A to a UPS.
i Install the UPS (DLP 110). 
ii Plug the optional 8-pin Molex output power cord in to the power connector 
(DLP 115).
13 Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
20000
ONT power
connector
Power cable connector
AC power converter
1 2 3 4
PON
1 2 3 4
1
2 3
4
PON
LINE 1
LINE 2
LINE 3
LINE 4
UPS
20151
Power
cable