EasyManuals Logo

Atlas Copco PowerMACS 4000 User Manual

Atlas Copco PowerMACS 4000
668 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #358 background imageLoading...
Page #358 background image
Tightening
358 9836 3521 01
IDLE
RUNNING
NORMAL
RUNNING
TERMINATE
The cycle is started
RUNNING
REPAIR
The bolt is ordered to
terminate
The bolt is ordered to
start repair
The bolt is ordered to
terminate
The bolt is ready with repair
The terminate
sequence is
done
There is no more to
execute and the station
orders the bolt to finish
The bolt is ready with repair when:
ï‚· The bolt reaches CE step.
ï‚· The bolt reaches RE step and no Repair with step is configured.
ï‚· All steps from Repair with step to the last step in the failing synchronization interval has been run.
The bolt failed running one of the steps in the failing synchronization interval. This causes an immediate
First try evaluation that affects all not terminated bolts in the station. If the evaluated reject action is Retry
the bolt reenters Running Repair.
If an initial repair ends with RE step and no repair step is configured cycle execution resumes at the step
where the Retry was ordered. Next step when running normal is the step after the step where Retry was
ordered. When another bolt fails in its Failing synchronization interval and the action determined by the
station is Retry or Terminate the steps run by the OK bolt is configured in the step where the retry was
ordered.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco PowerMACS 4000 and is the answer not in the manual?

Atlas Copco PowerMACS 4000 Specifications

General IconGeneral
BrandAtlas Copco
ModelPowerMACS 4000
CategoryPower Tool
LanguageEnglish

Related product manuals