Tightening
9836 3521 01 359
See the following example with Bolt 1 and Bolt 2. Bolt 1 fails in step 3 and 4. First failure Retry run on both
steps for all bolts:
Failing
synchronization
interval
3 Bolt transfer from state
RUNNING REPAIR to
RUNNING NORMAL
1 Bolt transfer from state
RUNNING NORMAL to
RUNNING REPAIR
2 Bolt transfer from state
RUNNING REPAIR to RUNNING
NORMAL to RUNNING REPAIR
Bolt 2 runs OK, but is ordered to Retry when bolt 1 fails:
2 Bolt 2 waits for bolt 1 to finish repair.
Retry ordered when repair ready. Run Retry
as configured in step 3
1 Bolt transfer from state
RUNNING NORMAL to
RUNNING REPAIR
3 Bolt 2 waits for bolt 1 to finish repair. Run Next
ordered when repair ready. Change state from
RUNNING REPAIR to RUNNING NORMAL.
When a bolt has reported that repair is ready, due to a CE step, the bolt will reenter state Running Normal
while waiting for the other bolts to finish. If any other bolt fails when running normal, reject management
will affect the bolt at CE. Retry and Terminate steps will be run as configured in the last step before the CE
step.
See the following example with Bolt 1 and Bolt 2. Bolt 1 fails in step 3 and 7. In step 3 First failure action is
Retry for all bolts. In step 7 First try action is Terminate for all bolts: