EasyManua.ls Logo

Cisco ASR 5000 Series

Cisco ASR 5000 Series
317 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASR 5000 Installation Guide
153
Chapter 12
Applying Power and Verifying the Installation
This chapter provides information and instructions for understanding the boot process, applying power to the chassis,
and verifying that the installation was successful.
Important: This chapter assumes that the ASR 5000 chassis, its sub-components, as well as application and line
cards have been physically installed. The system has also been cabled to interoperate with management and traffic
networks.
This chapter includes the following sections:
Understanding the System Boot Process
Applying Power to the Chassis
Verifying the Installation
Completing Initial System Configuration

Table of Contents

Other manuals for Cisco ASR 5000 Series

Related product manuals