NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf
This procedure installs the standard door of the ONS 15454 M6 shelf.Purpose
#2 Phillips Dynamometric screwdriverTools/Equipment
• NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6
Shelf , on page 327
• NTP-G252 Install the ONS 15454 M6 Shelf , on page 294
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, see the Electrostatic Discharge and Grounding Guide
for Cisco CPT and Cisco ONS Platforms.
• NTP-G253 Install the ECU or ECU-S Module, on page 349
• NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page
355
• NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf, on page
366
• NTP-G256 Install Power and Ground to the ONS 15454 M6 Shelf , on page
370
• NTP-G257 Install the Fan-Tray Assembly in the ONS 15454 M6 Shelf, on
page 388
• NTP-G290 Install the Cable and Fiber Modules, on page 391
• NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections
in Cisco ONS 15454 M6, on page 397
Prerequisite Procedures
As neededRequired/As Needed
OnsiteOnsite/Remote
NoneSecurity Level
Procedure
Step 1 Pull the hinge pins on the standard door in the opposite directions (see the following figure).
Cisco ONS 15454 Hardware Installation Guide
323
Installing the ONS 15454 M6 Shelf
NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf