EasyManua.ls Logo

Daewoo NUBIRA - Auxiliary Catalytic Converter Installation

Daewoo NUBIRA
744 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1G 6IENGINE EXHAUST
DAEWOO V121 BL4
4. Remove the auxiliary catalytic converter lower
flange nuts.
5. Remove the auxiliary catalytic converter and the
gaskets.
Installation Procedure
1. Install the auxiliary catalytic converter and the gas-
kets.
Important : Position the auxiliary catalytic converter onto
the exhaust manifold flange with one upper flange nut and
bolt.
2. Install the auxiliary catalytic converter lower flange
nuts and the bolts.
Tighten
Tighten the front connecting pipetoauxiliary cata-
lytic converter nuts to 35 NSm (26 lbft).
3. Install the remaining auxiliary catalytic converter
upper flange nuts.
Tighten
Tighten the auxiliary catalytic convertertoexhaust
manifold nuts to 35 NSm (26 lbft).

Table of Contents

Other manuals for Daewoo NUBIRA

Related product manuals