1. Configuration Workflow
This chapter describes the flow of work from the installation of the ETERNUS DX60 S5/DX100 S5/DX200 S5 in a
rack to the completion of the configuration and the flow of work from turning on the ETERNUS DX500 S5/DX600
S5/DX900 S5 to the completion of the configuration.
ETERNUS DX60 S5/DX100 S5/DX200 S5
โ
From Rack Installation to Completion of the Initial Setup
For details about the ETERNUS Web GUI operations affixed with the ( ) icon, refer to the FUJITSU Storage
ETERNUS video site in addition to this manual. (See the "Configuration Guide (Basic)" section in https://
www.fujitsu.com/global/products/computing/storage/eternus/video-library/afdx/index.html.)
When using power synchronization, perform the procedure described in "Power Synchronized Unit Connection"
(page 58).
Install in a rack
u "3.Rack Installation"
Attach network information labels
u "LAN Connection Preparation
for Operation Management"
Connect to the host
u "Host Interface Cable Connection"
Connect the drive enclosures
u "Drive Enclosure Connection"
Connect the administration terminal for setup
u "Administration Terminal Connection"
Connect the power cord
u "Power Cord Connection"
Turn on the ETERNUS DX
u "Powering On"
Start ETERNUS Web GUI
u "ETERNUS Web GUI Startup"
Perform the initial setup
u "Storage Management (Initial Setup 1)"
Connect LAN cables
Prepare the administration terminal for setup
u "Preparing the Administration Terminal for Setup"
ETERNUS DX
Operation management terminal
: Required
: Optional
: ETERNUS Web GUI operation
Completion of the initial setup
Administration terminal for setup
u "LAN Cable Connection(for Operation Management)"
17 Configuration Guide (Basic)