5.7 Transporting suspended loads over the machine
The operating company must use appropriate organisational measures to
ensure that no suspended loads are transported above the machine.
5.8 Preparing an emergency / evacuation plan
The operating company must prepare an emergency / evacuation plan
and train all relevant persons in this plan and provide appropriate instruc-
tions.
5.9 Training assembly engineers from other companies
Before undertaking any work, assembly engineers from other companies
must be informed by the operating company about obligatory safety regu-
lations, valid accident prevention guidelines as well as the machine's func-
tions and safety equipment. The corresponding instructions / manuals
must be made available.
5.10 Following the instructions of GEDA assembly engineers
If the machine is constructed by GEDA assembly engineers, their instruc-
tions must be complied with.
5.11 Provision of personal protective equipment
The operating company must provide personal protective equipment ap-
propriate to the respective place of use and purpose.
Protective equipment must be checked at regular intervals to ensure func-
tion and completeness.
All national and trade association regulations relating to protective equip-
ment must be observed in addition to this information.