15.3 Assembling the base unit
The base unit must be aligned horizontally and at right-angles to the building / scaffold-
ing.
The introduction of forces into the foundation solely takes place via load-distributing
supports (area min. = 0.25 m²).
Stand the base unit on load-distributing supports and align it with the support plates.
15.4 Mounting the first mast tie
Mount the first mast tie at a height of approx. 4 m. Ensure at least 50 cm safety dis-
tance to the car.
After assembling the mast tie check the alignment of the base mast with a spirit lev-
el.
WARNING
Danger to life caused by breakage or dislocation of the support
plates.
The support plates must not carry any load, they serve the sole pur-
pose of adjusting the base unit.
Secure at least two support plates with screws against dislocating.
Should this not be possible, the first mast tie must be mounted at
a height of one meter.
Once the base unit has been assembled you should check whether
it stands securely and can be used by personnel to assemble the
mast. For this purpose perform a test run with an empty car.
WARNING
Danger to life caused by mast breakage and dropping of the car.
The load capacity has been reduced to max. 300 kg:
- as long as no second mast tie has been mounted or
- by travelling along the cantilevered mast section (max. 5.5 m upper
edge of trolley to mast fastening).