EasyManua.ls Logo

Hioki Super megohm SM7110 - Measurement Procedure; Starting the Measurement

Hioki Super megohm SM7110
194 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Measurement Procedure
Measurement Procedure
Be sure to read “Operating Precautions” (p. 9) beforehand.
Installing, connecting, and turning on the instrument
Install the instrument. (p. 10)
Connect the temperature
and humidity sensor to
the instrument.
Connect the power cord
to the instrument.
Use the EXT I/O.
Communicate with the computer
through USB, RS-232C, or GP-IB.
Connect the measurement lead and
electrode to the instrument.
Turn on the instrument.
Connect the power cord to the instrument. (p. 29)
Connect the measurement lead, electrode, and the
Humidity Sensor to the instrument. (p. 30)
Connect other devices to the instrument via the
external interface (as needed).
Use the EXT I/O. (p. 110)
Connect a computer to the instrument for communications
through USB, RS-232C, or GP-IB. (p. 129)
Turn on the instrument. (p. 36)
(It takes at least 30 minutes to complete a warm-up.)
Setting the instrument (p. 39)
Set the measurement conditions (as needed).
Basic setting (p. 39)
Customized setting for measurement conditions (p. 49)
Setting related to the system (p. 99)
Default setting table (p. 107)
Starting the measurement
Execute the open correction. (p. 67)
If contact check is set to ON, execute the open correction.
Connect the measurement lead to an object to be
measured. (p. 45)
Start the measurement. (p. 46)
Check the measured values. (p. 46)
Press the STOP key to end the measurement. (p. 46)
If the trigger source setting is set to [EXTERNAL], the measurement automatically stops in completion
of each measurement.
Ending
Turn o󰀨 the instrument. (p. 36)

Table of Contents

Related product manuals