EasyManua.ls Logo

Hologic thinprep 2000 - MAINTENANCE SCHEDULE

Hologic thinprep 2000
284 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
MAINTENANCE
7.18
ThinPrep 2000 Processor Operator’s Manual
MAINTENANCE SCHEDULE
Table 7.1: Maintenance Schedule
Procedure Frequency
Waste Bottle Emptying As needed
Filter Cap Cleaning Daily
Pneumatic System Test
(see Chapter 3)
Weekly
Cap Seal O-ring Lubrication Weekly (or as needed)
Filter Seal O-ring Lubrication As needed
Filter Seal O-ring Replacement As needed
Door Cleaning As needed
General Cleaning Monthly
Waste Tubing Replacement
(in pinch valve)
Six months
Waste Filter Replacement As needed
Cap Seal Cleaning Daily
Empty and Clean Catch Tray (if present) As needed
SECTION
M

Table of Contents

Other manuals for Hologic thinprep 2000

Related product manuals