EasyManua.ls Logo

Honeywell EC350 - 3.5.1.1 Next steps

Honeywell EC350
249 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 EC350 installation
3.5 Installing EC350 on conventional diaphragm, rotary or turbine gas meters
Honeywell 2024
27
The following image illustrates the labels applied to the UMB, slides, and rivets.
3.5.1.1 Next steps
Verify if the digital index reading rotates in the proper direction. If not, perform the tasks described in the
following section, Changing the drive rotation ”, to position the bevel-gear thimble of EC350 to ensure
the reading rotates in the proper direction.

Table of Contents

Related product manuals