EasyManua.ls Logo

HP XP P9500 - Operating Procedure During a Path Failure between the Primary Storage System and the Local Storage System; Preparing

HP XP P9500
608 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
YKMAKE HOLD
YKEWAIT GOTO(HOLD)
8. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation Startup Procedure” (page 350).
9. Use Remote Web Console to set a Delta Resync control path required for each copy pair.
Operation is returned to normal.
Operating Procedure During a Path Failure Between the Primary Storage System and
the Local Storage System
The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.
Preparing
To prepare for maintenance:
1. Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.
376 Maintenance and Troubleshooting Operations

Table of Contents

Other manuals for HP XP P9500

Related product manuals