EasyManua.ls Logo

HP XP P9500 - Operating Procedure During an Intermediate Site Storage System Failure (Volatile)

HP XP P9500
608 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.
8. From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.
YKQUERY
YKRESYNC
YKEWAIT GOTO(DUPLEX)
Operation is returned to normal.
Operating Procedure During an Intermediate Site Storage System Failure (Volatile)
The following explains the procedures to be performed when the intermediate site storage system
is in a volatile failure state.
Using a 4x4x4 Cascade Configuration 409

Table of Contents

Other manuals for HP XP P9500

Related product manuals