EasyManua.ls Logo

HP XP P9500 - Failback to the Primary Site

HP XP P9500
608 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
YKQUERY
YKSUSPND REVERSE
YKEWAIT GOTO(SUSPEND)
7. Start primary site storage system maintenance.
8. Start operation on the local site.
Operation in the 2DC configuration is performed on the local site and remote site.
Failback to the Primary Site
To perform failback:
1. Terminate primary site storage system maintenance.
2. Stop operation on the local site.
3. From the primary site, execute the YKRESYNC REVERSE command for the Cnt Ac-S Z copy
pair.
302 Maintenance and Troubleshooting Operations

Table of Contents

Other manuals for HP XP P9500

Related product manuals