EasyManua.ls Logo

HPE Cloudline CL3100 Gen10

HPE Cloudline CL3100 Gen10
201 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 33
Hard disk drives
Removing an LFF HDD assembly
To remove an LFF HDD assembly:
1. Power down the server and detach all power cords from the power supplies.
2. Remove the access panel (on page 31).
3. Release the locking latches on the HDD assembly.
4. Grasp the locking lever and lift up to slide the HDD assembly. Do not force the locking lever to
exceed a 45° angle.
5. Lift up the HDD assembly to remove it.

Table of Contents

Related product manuals