c. Lift up the server to remove it from the rails completely. Place the server on a flat and sturdy
surface.
After you finish
Carefully lay the server on a flat, static-protective surface.
Install the server to rack
Follow instructions in this section to install the server to the rack.
S036
18 - 32 kg (39 - 70 lb) 32 - 55 kg (70 - 121 lb)
CAUTION:
Use safe practices when lifting.
R006
CAUTION:
Do not place any object on top of a rack-mounted device unless that rack-mounted device is intended
for use as a shelf.
About this task
Attention:
• Read
“Installation Guidelines” on page 35 and “Safety inspection checklist” on page 36 to ensure that you
work safely.
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 42.
CAUTION:
Make sure to have three people operate the server installation procedures to prevent injury.
Firmware and driver download: You might need to update the firmware or driver after replacing a
component.
• Go to
https://datacentersupport.lenovo.com/products/servers/thinksystem/sr655v3/7d9e/downloads/driver-
list/
to see the latest firmware and driver updates for your server.
• Go to
“Update the firmware” on page 190 for more information on firmware updating tools.
Watch the procedure
46
ThinkSystem SR655 V3 User Guide