5.2 Unpacking the device
Risk of injury due to heavy load!
The machine is heavy and bulky and cannot be transported or
lifted by one person!
Lift and transport the machine with two persons.
The graphic unpacking instruction is to be found in the covering
box. After having removed the cover of the box you can take the
unpacking instruction and proceed as described.
■ Unpacking the circuit board plotter
1. Transport the euro pallet with a lift truck to the work desk.
2. Lift the paper cover from the box.
3. Take the unpacking instruction and follow the instructions step by step.
♦ Now the circuit board plotter is unpacked and ready for installation.
Pos: 18 /ED_Tec hnische_Doku mentation/2_Be dienungsanleit ung/Maschine/R P_Fräsbohrpl otter/ProtoMat _S_Serie/ProtoMat _S_Serie_IIG/K apitel_5_Install ation_Inbetrieb nahme/5_ 3_Montage_und _Inbetriebnahm e @ 1\mod_13 18425291512 _2058.docx @ 37873 @ 2344 33 @ 1
5.3 Installation and commissioning
Prerequisite for installation and start of operation is that the PC
and the dust extraction are available at the work place. PC and
dust extraction must be ready for operation.
The control software CircuitPro has to be installed on the PC.