EasyManua.ls Logo

Maeda LC1385M-8BF - Page 119

Default Icon
384 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-55
4. Recovery Operation from Auto Stop
The recovery operation from overloading should be the reverse operation of the crane operation that
caused the auto stop. Perform one of the followings.
(1) Lower the hook and put down the hoisted load on the ground.
(2) Raise the boom. Lower the hook so that the hoisted load will be as low as possible.
(3) Retract the boom.

Table of Contents