EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove TMS9000-2 Series

Manitowoc Grove TMS9000-2 Series User Manual

Manitowoc Grove TMS9000-2 Series
430 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #248 background imageLoading...
Page #248 background image
OPERATING PROCEDURES TMS9000-2 OPERATOR MANUAL
4-38
Published 02-21-2019, Control # 611-05
12. Check the electrical system for correct operation, refer
to Checking the electrical system, page 4-38.
13. Check hydraulic oil temperature.
14. Adjust the brightness of the CCS display as required.
NOTE: See additional information on inspections during
crane operation, on permissible working positions
and on how to operate the individual power units,
refer to Crane operation with main boom, page 4-
55.
Checking the position of the hoist ropes
When possible check the entire length of the winding of
the ropes (1, Figure 4-31).
Slowly perform the lowering movement until the rope
has moved over a complete width (X) of the rope drum.
- The rope must be evenly wound.
- The rope turns on the drum must be evenly spaced,
0 to 2 mm (0 to 0.08 in) apart.
- The cross-over points must be offset by
approximately 180°.
NOTE:
Daily inspection of the rope is to inspect the length of rope to
be used that day.
Checking the electrical system
Check the following functions and have faulty parts repaired.
Working area spotlight
Boom position indicator light, rotating beacons
Windshield wipers, windshield washing system
Horn.
Adjusting the crane cab seat and front control panel
Crane cab seat
You can adjust the crane cab seat to your preference
Figure 4-32.
1. Adjust angle of seat back and lower seat cushion by
pushing or pulling on item 1 control in desired direction
Figure 4-32.
2. Adjust height of seat by pushing or pulling on item 2
control in desired direction.
DANGER
Entanglement hazard!
Contact with rope being spooled onto the hoist drum could
result in entanglement causing death or serious injury.
Stay clear of the rope and drum while the hoist is in
operation.
4907-2
FIGURE 4-30
8849-1
FIGURE 4- 31

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove TMS9000-2 Series and is the answer not in the manual?

Manitowoc Grove TMS9000-2 Series Specifications

General IconGeneral
BrandManitowoc
ModelGrove TMS9000-2 Series
CategoryConstruction Equipment
LanguageEnglish

Related product manuals