SET-UP AND INSTALLATION TMS9000-2 OPERATOR MANUAL
6-48
Published 02-21-2019, Control # 611-05
NOTE: Pin #1 will not unlock if pin #2 is unlocked.
11. Verify pin #1 is unlocked (1, Figure 6-83).
12. Using the tag line swing the extension out to engage the
extension anchor fittings (1, Figure 6-84) with the main
boom attachment fittings (2).
13. Install the pins (1, Figure 6-85) through the fittings using
an impact driver turning the jack screw (2)
counterclockwise. The jack screw drive bolt will bottom
out when the pins are fully engaged. The bolts and
washers (3) are at the end of the slots. Verify that the
pins are fully engaged and that the bolts and washers
are at the end of the slots.
14. On the CCS display select pin #2, unlock (Figure 6-86).
FIGURE 6-83
8969-10
1
Design A
Design B
9728-5
1
Unlocked
Locked