GROVE 6-73
TMS9000-2 OPERATOR MANUAL SET-UP AND INSTALLATION
6
Published 02-21-2019, Control # 611-05
From the side of the main boom
1. Attach a sling (Figure 6-143) to the boom extension and
an auxiliary crane.
2. Verify the locking bar (1, Figure 6-144) is secured
between the boom extension and the fly extension.
3. Push the Design A horizontal actuated hand levers (1,
Figure 6-145) towards the rear of the main boom. Push
the Design B vertical actuated hand levers fully
downwards. This disengages the pins securing the fly
extension to the main boom.
4. In the cab on the CCS display, press menu and then
select the extension menu (Figure 6-146).
FIGURE 6- 143
7567-32
FIGURE 6-144
8969-16
1
FIGURE 6-145
8969-20
1
Design B
9728-16
Design A
1